# CE Certified Solar Panel Production Line: Pre-Delivery Certification and Export Compliance

> Mga linya ng produksyon ng solar panel na sertipikadong CE mula sa Ooitech: Pagsunod sa Machinery at EMC Directive, third-party factory audit, pre-shipment inspection at kumpletong dokumentasyon para sa export.

![CE Certified Solar Panel Production Line: Pre-Delivery Certification and Export Compliance](https://cdn.ooitech.com/static/upload/image/20260928/ooitech-ce-certificate-solar-panel-production-line.webp)

- ** 2026-09-24
- ** 1 Views
- ** [Blog](./Blog.html)

## CE Certified Solar Panel Production Line: Pre-Delivery Certification and Export Compliance

**Ang isang linya ng produksyon ng solar panel ng Ooitech ay ipinapadala kasama ang CE certification at kumpletong pre-delivery compliance file.** Ang bawat linya ay sertipikado laban sa EU Machinery Directive 2006/42/EC at Electromagnetic Compatibility Directive 2014/30/EU ng isang independiyenteng notified body, na sinusuportahan ng supervised third-party factory audit. Nananatili kami kasama ng certification body mula sa unang design review hanggang sa paggawa, workshop testing, commissioning at final acceptance — kaya ang makinang dumarating sa inyong sahig ay ang parehong makinang sertipikado.

## Ano ang Aktwal na Saklaw ng CE Certification sa isang Linya ng Produksyon ng Solar Panel

Ang isang module assembly line ay hindi isang makina. Ito ay isang kadena ng mga makina — stringer, layup, bussing, laminator, trimming, framing, testing — bawat isa ay may sariling electrical cabinet, drives, guarding at interlocks. Ang isang CE certificate na ibinigay para sa “isang linya ng produksyon” ay makabuluhan lamang kapag pinangalanan ng certificate ang mga uri ng makina, ang mga modelo at ang mga direktiba kung saan ito nasuri. Ang sa amin ay ginagawa ito.

### Mga direktiba at harmonised standards na inilapat

| Item | Sanggunian |
| --- | --- |
| Machinery Directive | 2006/42/EC |
| Electromagnetic Compatibility Directive | 2014/30/EU |
| Low Voltage Directive (kung naaangkop) | 2014/35/EU |
| Kaligtasan ng makinarya — pangkalahatang prinsipyo para sa disenyo | EN ISO 12100:2010 |
| Electrical equipment ng mga makina | EN 60204-1:2018 |
| Harmonic current emissions | EN IEC 61000-3-2:2019 |
| Voltage fluctuations at flicker | EN 61000-3-3:2013+A1:2019 |
| Immunity, residential / industrial environments | EN IEC 61000-6-1:2019 / EN 61000-6-2:2005/A1:2011/AC:2012 |

## Saklaw ng Sertipikasyon ayon sa Pamilya ng Makina

Ang bawat pamilya ng makina na ginagawa namin ay nasuri laban sa parehong mga pangunahing direktiba. Ang talahanayan sa ibaba ay naglalahad ng mga direktiba at harmonisadong pamantayan na inilapat sa bawat pamilya, upang makita mo nang eksakto kung ano ang saklaw ng sertipiko para sa iyong kagamitan.

| Pamilya ng makina | Mga Modelo | Mga direktiba at pamantayang inilapat |
| --- | --- | --- |
| Linya ng Produksyon ng Solar Panel | GR, OT-PV, OT-CX | 2006/42/EC, 2014/30/EUEN ISO 12100:2010, EN 60204-1:2018, EN IEC 61000-3-2:2019, EN 61000-3-3:2013+A1:2019, EN IEC 61000-6-1:2019, EN 61000-6-2:2005/A1:2011/AC:2012 |
| Solar Cell Laser Cutting Machine | OLS-20F, OLS-2000F, OLS-2000S, OLS-4000S, OLS-2000XS | 2006/42/EC, 2014/30/EU, 2014/35/EU |
| Laser Non-Destructive Cutting Machine | SLS-UD3600, SLS-UD7000 | 2006/42/EC, 2014/30/EU, 2014/35/EU |
| Full Automatic Laminator | OTCY-2222, OTCY-3622, OTCY-4523, OTCY-5524 | 2006/42/EC, 2014/30/EU, 2014/35/EU |
| Full Automatic EL Defect Tester | OTEL-A, OTEL-AI | 2006/42/EC, 2014/30/EU, 2014/35/EU |
| Solar Cell Module Sun Simulator / Tester | OTCT-A, OTCT-B, OTMT-A, OTMT-B | 2006/42/EC, 2014/30/EU, 2014/35/EU |
| Full Automatic Framing Machine | OTZK-A, OTZK-AL | 2006/42/EC, 2014/30/EU, 2014/35/EU |

Ang attestation certificate sa ibaba ay ang kasalukuyang rehistro para sa Solar Panel Production Line, mga modelong GR, OT-PV at OT-CX, na inisyu ng UDEM International Certification (Turkey), isang independiyenteng notified body, at may bisa hanggang 08.09.2027.

*CE attestation certificate para sa Ooitech solar panel production line (mga modelong GR, OT-PV, OT-CX), may bisa hanggang 08.09.2027. Ang mga numero ng ulat at sertipiko ay nakatago sa web copy na ito at inilalabas nang buo sa loob ng commercial documentation package.*

Ang mga rehistrong sumasaklaw sa mga indibidwal na makina sa talahanayan sa itaas ay sumusunod sa parehong hanay ng direktiba. Ang ilan ay inisyu sa ilalim ng mga naunang rebisyon ng mga direktibang iyon at muling inisyu laban sa kasalukuyang mga rebisyon. Kapag hiniling mo ang sertipiko para sa isang partikular na modelo, ipinapadala namin ang dokumentong nagpapangalan sa modelong iyon — kaya ang iyong import file, tender submission o customs package ay laging tumutukoy sa isang sertipiko na aktwal na sumasaklaw sa kagamitan sa order.

## Saklaw ng Sertipikadong Makina

Kapag bumili ang isang customer ng buong linya, nagbibigay kami ng certificate set na tumutugma sa aktwal na bill of equipment, hindi isang generic na sheet:

- Mga stringer / tabber at bussing machine
- Mga solar cell laser cutting at laser non-destructive cutting machine
- Mga layup, glass loading at EVA / TPT cutting station
- Mga laminator at trimming station
- Mga framing machine at glue dispenser
- Mga EL defect tester at module sun simulator
- Mga conveyor, turning unit at ang integrated line control system

## Paano Kami Nagtatrabaho sa Certification Body: Disenyo, Paggawa, Commissioning

Ang sertipikasyon ay isang proseso, hindi isang dokumentong binili sa dulo ng proyekto. Ang mga customer na bumibisita sa amin para sa factory acceptance test ay karaniwang napapansin na ang certification body ay kasangkot na bago pa matapos ang makina. Ito ay sinasadya.

### 1. Design review — bago putulin ang bakal

Ang mga electrical schematic, guarding layout, safety circuit architecture (emergency stop category, interlocks, door switches), pneumatic at hydraulic circuit, at ang risk assessment sa EN ISO 12100 ay isinusumite para sa review. Ang mga non-conformity ay itinatama sa drawing, kung saan ang pagbabago ay walang gastos.

### 2. Paggawa — verification ng component at traceability

Sa panahon ng pagbuo, itinatago namin ang mga component certificate at nameplate data na pinagbabatayan ng assessment: contactors, safety relays, drives, servo amplifiers, mga uri ng cable, EMC filters at shielding practice. Ang makinang ginawa gamit ang mga kapalit na component ay hindi ang sertipikadong makina, at may karapatan ang auditor na suriin.

### 3. Workshop testing — EMC at electrical safety

Ang linya ay pinapatakbo sa aming workshop at sinusuri para sa earth continuity, insulation resistance, dielectric strength, residual voltage, harmonic current emissions at immunity behaviour. Ang mga test record at technical file ay binubuo dito, bago ang shipment.

### 4. Commissioning — verification sa inyong site

Pagkatapos ng installation, ang aming mga engineer ay nagko-commission ng linya at muling nagbe-verify ng mga safety function sa ilalim ng tunay na kondisyon ng produksyon. Ang dokumentasyon, mga drawing, technical file, declaration of conformity at pagsasanay ng operator ay ibinibigay laban sa isang pinirmahang acceptance checklist.

Kung ang certification body ay nangangailangan ng pagbabago sa anumang yugto, ipinapatupad namin ito at muling isinusumite. Hindi kami nagpapadala ng linya na may bukas na non-conformity at umaasa na makakapasa ito sa destinasyong daungan.

## Third-Party Factory Audit

Bukod sa certification ng makina, ang aming pasilidad ng produksyon ay independiyenteng na-audit ng Focus Technology Co., Ltd. sa ilalim ng pangangasiwa ng T&Uuml;V Rheinland (report MIC-ASI239058, Pebrero 2023). Sakop ng audit ang pangkalahatang impormasyon ng kumpanya, kakayahan sa foreign trade, kakayahan sa R&D ng produkto, sistema ng pamamahala at certification ng produkto, kakayahan sa produksyon at kontrol sa kalidad, kapaligiran sa trabaho, pagtitipid sa enerhiya at pagbabawas ng emisyon, at photographic verification ng planta.

Verified supplier din kami sa Made-in-China.com, na may pampublikong showroom sa solarmakingmachine.en.made-in-china.com.

## Suporta sa Pre-Shipment Certification at Inspection

Nakipag-ayos kami ng SGS pre-shipment inspection para sa mga customer, at nakikipagtulungan kami sa iba pang mga ahensya ng inspeksyon at sertipikasyon kapag hiniling. Depende sa destinasyon at mga tuntunin ng kontrata, maaaring kabilang dito ang:

- SGS pre-shipment inspection, sa nominasyon ng mamimili at laban sa napagkasunduang purchase order
- Witnessed factory acceptance testing kasama ang engineer ng mamimili o isang nominadong third party na naroroon
- Container loading supervision at photographic loading reports
- Voltage, plug at documentation adaptation para sa destinasyong merkado

Ang mga ito ay inaayos ayon sa purchase order. Sabihin sa amin sa yugto ng quotation kung anong inspection regime ang kailangan ng iyong merkado o letter of credit at isasama namin ito sa presyo ng alok sa halip na matuklasan ito sa daungan.

## Sertipikasyon para sa Ibang Mga Merkado — Inaaplay Bawat Proyekto

Saklaw ng CE ang EU at EEA. Para sa ibang mga destinasyon, nag-aapply kami para sa sertipikasyong kailangan ng merkado, sa batayan ng proyekto, sa halip na ipadala ang makina at ipaubaya sa mamimili ang conformity paperwork. Depende sa destinasyon, maaaring kabilang dito ang:

- **Hilagang Amerika** — NRTL listing o field evaluation (UL, ETL o katumbas) para sa control panel at electrical assembly, kasama ang voltage at frequency adaptation
- **United Kingdom** — UKCA marking
- **Gitnang Silangan at Hilagang Aprika** — SASO / SABER para sa Saudi Arabia at mga country-specific certificate of conformity
- **Timog-silangang Asya, Timog Asya at Aprika** — mga certificate of conformity at pre-shipment inspection gaya ng nakasaad sa letter of credit
- **Anumang merkado** — mga IEC-based test report at technical file na maaaring suriin ng lokal na notified body o testing house

Dahil ang bawat linya ay itinayo ayon sa EN ISO 12100 risk assessment na may EN 60204-1 electrical practice mula pa sa simula, ang karagdagang trabaho para sa mga scheme na ito ay karaniwang testing at dokumentasyon kaysa redesign. Sabihin sa amin ang destinasyon kapag humiling ka ng quotation at ang saklaw ng sertipikasyon ay isasama sa alok.

## Ang Export Documentation Package

Bawat shipment ay umaalis na may dokumentong naglilinis ng customs nang walang ikalawang round ng mga email:

| Dokumento | Layunin |
| --- | --- |
| CE attestation certificate at Declaration of Conformity | EU at EEA market access, tenders, technical file |
| Test reports (safety / EMC) | Patunay ng assessment basis |
| Installation, operation at maintenance manuals | Operator at maintenance reference, multi-language |
| Electrical drawings at spare parts list | Lokal na maintenance at future spares |
| Packing list at commercial invoice | Customs clearance |
| Certificate of origin | Duty treatment at import formalities |
| Wooden case IPPC / fumigation marking | Phytosanitary at port compliance |

## Saan Na-export ang Aming mga Linya

Ang kagamitan ng Ooitech ay tumatakbo sa mga pabrika ng customer sa **North America, Europe, Southeast Asia at Middle East**, kasama ang mga proyekto sa Africa, South Asia at Australia. Kabilang sa reference installations ang 60 MW solar panel production line sa Mali, 300 MW line sa Armenia, 30 MW factory sa Gujarat, India, at ang unang fully automatic solar panel production line ng Egypt.

Iba't ibang merkado ang nagtatanong ng iba't ibang bagay. Ang mga customer sa EU ay nakatuon sa Declaration of Conformity at technical file. Ang mga customer sa North America ay nagtatanong tungkol sa voltage, control-panel standards at spare parts turnaround. Ang mga customer sa Southeast Asian at Middle Eastern ay madalas na humihingi ng inspection support at loading supervision bilang bahagi ng kontrata. Nakapag-isyu na kami ng certification at compliance files para sa lahat ng sitwasyong ito.

## Mga Madalas Itanong

### Sakop ba ng CE certificate ang buong production line o ang mga indibidwal na makina?

Pinangalanan ng aming certificate ang mga uri at modelo ng makina na sakop nito. Sa isang buong linya, nagbibigay kami ng certificate set na tumutugma sa aktwal na bill of equipment, kaya bawat makina na nangangailangan ng CE marking ay may dokumentasyon sa likod nito.

### Aling mga direktiba ang sinusunod ng certification ng solar panel production line?

Machinery Directive 2006/42/EC at EMC Directive 2014/30/EU. Ang mga makina na may sariling electrical enclosure ay maaari ring saklaw ng Low Voltage Directive 2014/35/EU.

### Maaari ba ninyong ayusin ang SGS o iba pang third-party inspection bago ang shipment?

Oo. Nakipag-ayos kami ng SGS pre-shipment inspection para sa mga customer at nakikipagtulungan sa iba pang mga ahensya kapag hiniling, sa nominasyon ng mamimili at sa loob ng purchase order. Tumatanggap din kami ng witnessed factory acceptance test na may engineer ng mamimili na naroroon.

### Na-audit ba ang pabrika ng independiyenteng organisasyon?

Oo. Ang aming pasilidad ay na-audit sa ilalim ng pangangasiwa ng T&Uuml;V Rheinland noong Pebrero 2023 (report MIC-ASI239058), na sumasaklaw sa production capacity, quality control, R&D capacity at management systems.

### Nagbibigay ba kayo ng sertipikasyon para sa mga merkado sa labas ng EU, tulad ng Hilagang Amerika?

Oo. Nag-aapply kami para sa sertipikasyong kailangan ng isang merkado sa batayan ng proyekto — halimbawa NRTL listing o field evaluation (UL, ETL o katumbas) para sa Hilagang Amerika, UKCA para sa United Kingdom, at SASO / SABER o iba pang certificate of conformity para sa Gitnang Silangan. Sabihin sa amin ang destinasyon kasama ng iyong katanungan.

### Ano ang kailangan kong ibigay para sa certification o compliance quotation?

Destinasyong bansa, kinakailangang voltage at frequency, listahan ng makina na balak mong bilhin, at anumang inspection regime na nakasaad sa iyong letter of credit o tender documents. Ipadala ang mga ito kasama ng iyong enquiry at isasama ang compliance package sa alok.

---

##### Mga Tag :

![](/template/ooitech/assets/img/shape/06.png)

![](https://cdn.ooitech.com/runtime/image/w800_h700_fitblur_v2_w800_h700_fitblur_v2_1757399770541443.webp)

### Humiling ng Quote

Lahat ng upload ay secure at kumpidensyal.

## Naghahatid kami ng expertise na maaasahan mo aming serbisyo

Direct-from-Factory Equipment.

![](/template/ooitech/assets/img/icon/money-2.svg)

### Mga Kalamangan na Cost-Effective

Naghahatid kami ng pambihirang halaga, pinalalaki ang mga resulta habang ino-optimize ang badyet para sa mga kliyente.

![](/template/ooitech/assets/img/icon/staff.svg)

### Ang Aming Experienced Team

Ang aming mga bihasang propesyonal ay dalubhasa sa mga makabagong solusyon at mga pasadyang estratehiya.

![](/template/ooitech/assets/img/icon/certified.svg)

### 15+ Taon ng Karanasan sa Industriya

Ang malalim na kadalubhasaan ay nagsisiguro ng maaasahan, may kamalayan sa uso, at napatunayang mga resulta para sa tagumpay.

![](https://cdn.ooitech.com/static/upload/image/20250910/1757477357667605.webp )

![](https://cdn.ooitech.com/static/upload/image/20250910/1757477724911512.webp)

![](/template/ooitech/assets/img/shape/06.png)

## Ano ang Sinasabi ng Aming Kliyente Sabi tungkol sa amin

Pinupuri ng mga testimonya ng kliyente ang aming malalim na pag-unawa sa kanilang mga hamon, na humahantong sa mga makabagong solusyon at matibay na ROI. Ang mga pangmatagalang pakikipagtulungan—ang ilan ay mahigit isang dekada—ay nagpapakita ng kanilang tiwala at kasiyahan. Ang kanilang mga kuwento ng tagumpay ay nagtutulak sa amin na patuloy na malampasan ang mga inaasahan. [Alamin Pa **](#quote-form)

![](/template/ooitech/assets/img/icon/quote.svg)

Isang lalaking may malaking puso. Maraming salamat sa iyong pagbisita Mr Wu. Maraming salamat sa mga serbisyong ibinigay sa pag-install ng kagamitan at pagsasanay sa aking mga estudyante. Ang pinakamabait na tao at propesyonal sa kanyang larangan

![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026041716444445.webp)

### Jizzakh Polytechnic Institute

![](/template/ooitech/assets/img/icon/quote.svg)

Salamat sa Ooitech sa pagbibigay ng ganap na awtomatikong kagamitan sa produksyon—napakahusay ng inyong pag-install at serbisyo pagkatapos ng benta.

![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026041720921238.webp)

### Amjad

![](/template/ooitech/assets/img/icon/quote.svg)

Salamat sa Ooitech sa pagbibigay ng lubos na angkop na kagamitan sa eksperimento ng BC solar cell.

![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1776426122864564.webp)

### KTECH

![](/template/ooitech/assets/img/icon/quote.svg)

Maraming salamat muli sa napakalaking tulong para sa pagpapabuti at pag-aayos ng pabrika at pati na rin sa pagtuturo sa mga manggagawa kung paano gamitin ang mga makina

![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1757479675272137.webp)

### Mark

BIPV Philippines

![](/template/ooitech/assets/img/icon/quote.svg)

salamat sa propesyonal na suporta ng ooitech at sa on time na after service.

![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1784509010217979.webp)

### Diarra Mula sa Africa

## Aming Pinakabagong mga Produkto

![OPT-M960B EL at VI Tester: 0.1mm/pixel, Intel i7](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774351816741704.webp)

- [** Rachael](./solar-panel-el-tester-and-vi-tester-machine-opt-m960b-m951b-m950b-ooitech-solar-module-el-testing-equipment.html)
- [** 43520](./solar-panel-el-tester-and-vi-tester-machine-opt-m960b-m951b-m950b-ooitech-solar-module-el-testing-equipment.html)

### OPT-M960B EL at VI Tester: 0.1mm/pixel, Intel i7

Nag-aalok ang Ooitech ng propesyonal na solar panel EL tester at VI tester machines (OPT-M960B, OPT-M951B, OPT-M950B) na may SONY industrial cameras

![AM050FH MBB Tabber Stringer: 6800 Strip/oras, ±0.05mm](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774262936967131.webp)

- [** ooitech](./am050fh-mbb-pv-cell-soldering-stringer-fully-automatic-solar-cell-tabber-stringer-machine-ooitech.html)
- [** 56753](./am050fh-mbb-pv-cell-soldering-stringer-fully-automatic-solar-cell-tabber-stringer-machine-ooitech.html)

### AM050FH MBB Tabber Stringer: 6800 Strip/oras, ±0.05mm

Automatic solar cell tabber stringer: Ang AM050FH ay naghihinang ng multi-busbar cells na may laser half-cut at 1/3-cut sa isang platform, para sa MBB at half-cut lines.

![PV Backsheet para sa Solar Modules — TPT, KPK, PVDF](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774518934395196.webp)

- [** Rachael](./Photovoltaic-Backsheet-The-Critical-Protective-Layer-for-Solar-Modules.html)
- [** 13478](./Photovoltaic-Backsheet-The-Critical-Protective-Layer-for-Solar-Modules.html)

### PV Backsheet para sa Solar Modules — TPT, KPK, PVDF

PV backsheet para sa solar modules sa TPT, KPK, PVDF at transparent grades: UV-resistant, electrically insulating at moisture-blocking na proteksyon sa likod.

![CHT9930A Tester ng Ground Continuity: 5-60A, 600W](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774605285835810.webp)

- [** ooitech](./cht9930a-solar-module-ground-continuity-tester-dc-5-60a-programmable-grounding-resistance-test-equipment-ooitech.html)
- [** 454](./cht9930a-solar-module-ground-continuity-tester-dc-5-60a-programmable-grounding-resistance-test-equipment-ooitech.html)

### CHT9930A Tester ng Ground Continuity: 5-60A, 600W

Ang CHT9930A Ground Continuity Tester ay naghahatid ng programmable DC 5-60A output current na may 0.01μΩ-600mΩ measurement range para sa solar module grounding resistance

![Shingled Stringer SL-30C: ±0.15mm, 1800mm String](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774263321793147.webp)

- [** ooitech](./automatic-shingled-stringer-sl-30c-shingled-solar-cell-welding-machine-ooitech.html)
- [** 87477](./automatic-shingled-stringer-sl-30c-shingled-solar-cell-welding-machine-ooitech.html)

### Shingled Stringer SL-30C: ±0.15mm, 1800mm String

Ang Ooitech SL-30C Automatic Shingled Stringer ay isang high-speed shingled solar cell welding machine na may 3000-5000 pcs/h capacity, CCD camera inspection

![CHT9951A Hipot Tester ng Insulasyon: 0.1-10kV DC](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774601338282260.webp)

- [** Rachael](./cht9951a-cht9951b-solar-panel-hipot-insulation-resistance-tester-pv-module-safety-testing-equipment.html)
- [** 58679](./cht9951a-cht9951b-solar-panel-hipot-insulation-resistance-tester-pv-module-safety-testing-equipment.html)

### CHT9951A Hipot Tester ng Insulasyon: 0.1-10kV DC

CHT9951A/CHT9951B hipot at insulation resistance tester para sa solar PV module testing. DC output hanggang 10kV, insulation resistance hanggang 99GΩ
